캐나다, 2040년까지 최대 10기 원자로 짓는 ‘원자력 르네상스’ 추진
Last updated 2026-06-23 · benchmark measured 2026-08-09 — deterministic & reproducible
Canada breaks ground on the Western world's first grid-scale small modular reactor in Ontario.
Is 캐나다, 2040년까지 최대 10기 원자로 짓는 ‘원자력 르네상스’ 추진 production-ready?
Legit.Show scores 캐나다, 2040년까지 최대 10기 원자로 짓는 ‘원자력 르네상스’ 추진 63 out of 100 — the simple average of its 6 measured frames. Legit.Show ran its deterministic 7-Frame production-readiness benchmark on 캐나다, 2040년까지 최대 10기 원자로 짓는 ‘원자력 르네상스’ 추진 (public-surface assessment), measured from the public surface with no LLM in the scoring path. Its strongest frame is Reliability; its weakest is Privacy. 6 of the seven frames returned a score; Accessibility was not measurable on this service and is recorded as null — not as zero. Every frame it averages is published with its evidence on the Legit.Show listing.
The 7 Frames
- Performance — 80/100
- Accessibility — not measurable on this service (null — not scored as 0)
- Security — 25/100
- Privacy — 0/100
- Reliability — 100/100
- Standards — 75/100
- Discoverability — 100/100
What we measured
- No Content-Security-Policy and no HSTS.
- Served over HTTPS with a valid certificate.
- Real Lighthouse performance run — 344 ms to first byte.
- Returns a proper 404 for unknown routes.
- 3 of 3 sampled routes reachable.
- No privacy policy found.
- Sets cookies / loads scripts with no consent prompt.
- Discoverable: structured data, sitemap, OpenGraph image, canonical URL.
Who built it
product account @autonocion
Who it's for
Energy utilities · Provincial governments · Clean energy advocates · Electricity consumers · Power grid operators
Pricing
CAD 20.9 billion total for four 1,200 MW reactors (~CAD 5.2B first unit, dropping to ~CAD 4.1B fourth unit); estimated power cost ~14.9 cents/kWh.
Visit 캐나다, 2040년까지 최대 10기 원자로 짓는 ‘원자력 르네상스’ 추진 → · Alternatives to 캐나다, 2040년까지 최대 10기 원자로 짓는 ‘원자력 르네상스’ 추진 → · How this was measured →